How long will a pool builder near me take to get you from yard visit to first swim?
Usually somewhere between 12 and 24 weeks in total, going by Epic Watershapes’ own numbers. The page says approvals take 4 to 12 weeks, and then construction takes 8 to 12 weeks once those approvals clear. The first part is the one that swings.
That 12 to 24 total is my own addition of the page’s two windows, not a promise from Epic. If you’re comparing a pool builder near me against others, this is the timeline to ask each one for, stage by stage.
What happens before any clock starts?
A site visit, and nothing is signed yet. Epic walks the yard and measures four things: the lot, the access, the setbacks and the equipment run. The page says those four are what actually move the price. Access gets special attention, since whether a rig can reach the yard decides a lot.
There’s no deposit and no obligation to build. The page also asks for a budget band on its form, from $60,000 to $100,000 up to $250,000 and beyond, plus an option for people who need guidance. Epic replies Monday to Saturday, 8am to 5pm.
What arrives 72 hours after the yard walk?
A 3D design of your pool and an itemised price that holds. Not a range, not a number over the phone. It’s free and it’s yours to keep either way, so you can walk away with the drawing if you choose another company.
Honestly, it’s the quickest stage of the whole schedule. The number is meant to hold because access was surveyed first. If you’re lining up a pool builder near me and a company can’t put an itemised price in writing, that’s a fair thing to ask about.
Why do approvals take 4 to 12 weeks?

That window covers design, engineering, HOA or club approval and municipal permitting. It’s wide because the pieces vary. Some towns review plans in house, while others send them to an outside firm, which adds a step and time. Epic says it researched all thirty six municipalities in Palm Beach and Broward County.
Then there’s HOA and club review. Country clubs and gated communities run their own architectural review on top of the city’s, and the page says that approval sits on the critical path. Epic builds it into the schedule and puts the package together, so the homeowner isn’t chasing a plan reviewer.
Drawings and filing
Epic prepares the engineering and permit drawings and submits them to the municipality. The page lists engineering and permit drawings as included in new pool construction, so they’re part of the job. Ask any company whether the same is true for them.
What does the build itself look like?
Construction takes 8 to 12 weeks once approvals clear. Epic builds gunite pools, engineered for the water table, soil and wind code of the place you build in, and the same company permits, digs, finishes and inspects. No handing the shell to a subcontractor.
Spas, sun shelves, water features, deck and coping can be part of the same build. One Google reviewer on the page said their Boca Raton pool took 6 weeks from the first dig to completion. That’s one customer’s account, and the page doesn’t promise it for everyone.
Does the coast change the schedule or the spec?
Salt air, wind exposure and tight lot access change what equipment, finish and hardware will last. The page says the right specification on the coast isn’t the right one inland, and Epic quotes them differently. So a coastal job can look different on paper from an inland one.
The page doesn’t say that coastal jobs take longer, so I won’t claim it. What it does say is that the approval window varies by town, and Epic tells you which window applies at the survey. That’s your cue to ask for the window in writing.
Who do you call if something goes wrong later?
Epic holds the licence, CPC1460900, and carries the engineering, permit, shell, finish and warranty under one contract. The page says if a tile lifts in year two, there’s no one else for Epic to blame. One number to call, open Monday to Saturday, 8am to 5pm.
The credentials listed include a BBB A+ rating, full insurance, and membership in the Florida Swimming Pool Association. The page also reports 125 five star reviews out of 126, and work in Palm Beach and Broward County since 2019.
What if the pool is old and needs a remodel instead?
Not every job is a new build. Many owners start with a search for pool contractor near me because the plaster or tile looks tired, and Epic lists remodeling and resurfacing for that: new plaster and finish, new tile and coping, new equipment, structural repair or a full redesign of the shell and deck.
The page puts a full remodel or resurfacing project at around $20,000 to start and says an aging pool gets more expensive every season it waits. It gives no remodel timeline, so ask any pool contractor near me for one in writing before you book.
Can a shared pool follow the same schedule?
Epic runs a separate commercial department for condominium and homeowner associations, clubs and hotels. It’s built around how a board buys: a bid against a spec, with one point of contact. The page lists code compliance and inspection coordination as part of that work.
Ongoing service and resurfacing contracts are on that list too. The page doesn’t give commercial timelines, so a board should ask for a schedule alongside the bid, not after it.
What should you ask any builder about timing?
Ask any pool contractor near me for the schedule in two parts, approvals and construction, with the time your town’s review could add. Ask who files the permit, who handles the HOA package, and who you call when a step slips. Epic’s page answers each of those, so it’s a decent yardstick.
Epic also lists an office at 1120 Holland Drive, Suite 13, in Boca Raton, and the email office@epicwatershapes.com. Sending a real question there is a cheap way to see how fast and clearly a company replies.
So how long should you plan for?
Plan for 4 to 12 weeks of approvals, then 8 to 12 weeks of construction, with your town deciding the first part. Start with a free 3D design and itemised price within 72 hours of the yard walk. Whether you choose a pool builder near me or a pool contractor near me, get the schedule in writing.
FAQs
How long does it take from approvals to first swim?
Going by the page, 4 to 12 weeks of approvals, then 8 to 12 weeks of construction.
Why do approvals vary so much?
Towns differ. Some review plans in house, others use an outside firm, and clubs add their own review.
Does a pool builder near me file the permit for me?
Epic does. It prepares the engineering and permit drawings and submits them to the municipality.
Is a pool contractor near me able to remodel an old pool?
Epic lists remodeling and resurfacing, starting around $20,000 on the page.
Do I pay anything before I see the design?
No. The page says no deposit and no obligation to see the design.